Econoline E250 3/4 Ton V8-5.4L CNG VIN M (1998)
5. Connect the No.3 and No.4 fuel injector and the No.2, No.3 and No.4 coil-on-plug connectors.
6. Install the engine cover.
7. Connect the oil pressure switch connector.
8. Connect the crankshaft position sensor and the air conditioning compressor connectors.