Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
Windsor Engine
3. Tighten the bolts in the sequence shown.
All Engines
4. Install the crankcase vent connector and hose into the valve cover.
5. Install the fuel charging wiring on the valve cover studs.