Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
^
Connect the A/C liquid jumper line.
^
Connect the inlet line.
2. Install the thermocouple.
^
Use electrical wire wrap tape.
3. Install the A/C evaporator core.
4. Evacuate and charge the system.
5. Check the system for proper operation.