Econoline E350 1 Ton V8-5.4L SOHC VIN L (1999)
6. Connect the auxiliary evaporator to compressor line spring lock coupling.
7. Install the screw.
8. Install the battery tray.
9. Install the battery.
10. Evacuate and charge the A/C system.
6. Connect the auxiliary evaporator to compressor line spring lock coupling.
7. Install the screw.
8. Install the battery tray.
9. Install the battery.
10. Evacuate and charge the A/C system.