Econoline E350 1 Ton V8-5.4L SOHC VIN L (1999)
1. Install the EPC solenoid.
2. Connect the molded lead frame to the solenoids.
^
Connect the bulkhead inter-connector.
^
Connect the electronic pressure control (EPC) solenoid.
^
Connect the torque converter clutch (TCC).
^
Connect the shift solenoid SSA and SSB.
3. Install the manual control lever.