Edge AWD V6-3.5L (2009)
H6 CHECK FOR CORRECT IC OPERATION
-
Disconnect the IC connector.
-
Check for:
-
corrosion
-
damaged pins
-
pushed-out pins
-
Connect the IC connector and make sure it seats correctly.
-
Operate the system and verify the concern is still present.
-
Is the concern still present?
Yes
INSTALL a new IC. CLEAR the DTCs. REPEAT the network test with the scan tool.
No
The system is operating correctly at this time. The concern may have been caused by a loose or corroded connector. CLEAR the DTCs. REPEAT the
network test with the scan tool.
-------------------------------------------------
Pinpoint Test I: The Smart Junction Box (SJB) Does Not Respond To The Scan Tool
Communications Network
Pinpoint Tests
Pinpoint Test I: The Smart Junction Box (SJB) Does Not Respond To The Scan Tool
Refer to Wiring Diagram Set 10, Grounds for schematic and connector information. See: Diagrams/Electrical Diagrams/Diagrams By Number
Refer to Wiring Diagram Set 13, Power Distribution/SJB for schematic and connector information. See: Diagrams/Electrical Diagrams/Diagrams By
Number
Refer to Wiring Diagram Set 14, Module Communications Network for schematic and connector information. See: Diagrams/Electrical
Diagrams/Diagrams By Number
Normal Operation
The Smart Junction Box (SJB) communicates with the scan tool through the Medium Speed Controller Area Network (MS-CAN). Circuits VDB06
(GY/OG) (MS-CAN +) and VDB07 (VT/OG) (MS-CAN -) provide the network connection to the SJB. Voltage for the SJB is provided by circuit
CDC33 (VT/GN). Circuit GD133 (BK) provides ground.
This pinpoint test is intended to diagnose the following:
-
Fuse
-
Wiring, terminals or connectors
-
SJB
PINPOINT TEST I: THE SJB DOES NOT RESPOND TO THE SCAN TOOL
NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.
NOTE: Failure to disconnect the battery when instructed will result in false resistance readings. Refer to Battery.
-------------------------------------------------
I1 CHECK THE SJB FUSE FOR VOLTAGE
-
Ignition OFF.
-
NOTE: Measurements are taken with the fuses installed.
-
Measure the voltage between the SJB fuse 5 (10A) and ground.