ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Variable Valve Timing > < Timing Cover|Specifications|Page 1973
Page 5
background image

9. Connect the CKP electrical connector.

10. Attach the wiring harness retainer to the engine front cover stud bolt.

11. Install the accessory drive belt tensioner and the 3 bolts.

-

Tighten to 25 Nm (18 lb-ft).

12. Position the generator and install the stud.

-

Tighten to 8 Nm (71 lb-in).

13. Install the generator bolt and 2 nuts.

-

Tighten to 47 Nm (35 lb-ft).

14. Install the crankshaft front seal. For additional information, refer to Lower End Components - Exploded View  See: Service and Repair/Removal

and Replacement/Lower End Components - Exploded View and Crankshaft Front Seal  See: Seals and Gaskets/Front Crankshaft Seal/Service and
Repair/Crankshaft Front Seal.

15. Fill the engine with clean engine oil.

16. Connect the battery ground cable.

17. Using the scan tool, perform the Misfire Monitor Neutral Profile Correction procedure, following the on-screen instructions.

Variable Valve Timing > < Timing Cover|Specifications|Page 1973