EXP L4-098 1.6L VIN 4 2-bbl (1982)
Fig. 9 Assembling constant velocity joints onto halfshafts
Fig. 10 Installing constant velocity joint clamp
Fig. 11 Halfshaft assembled length. 1982 & 1983 Early Models
INSTALLATION
1.
Inspect splines at each end of shaft for damage and wear. Inner constant velocity joint must be installed onto longer splines, Fig. 9.
2.
Ensure stop ring is in proper position, then install new circlip into groove nearest end of shaft.