ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Drainback Test|Page 6415 > < Drainback Test
Page 1
background image

Torque Converter: Testing and Inspection
End Play Check

1. Install the End Play Checking Tool.

(1) Insert the End Play Checking Tool fully into the torque converter pump drive.
(2) Tighten the inner post until the tool is securely locked.

2. Attach the Dial Indicator with Bracketry to the End Play Checking Tool.

-

Position the (A) indicator button between the ridges on the converter housing and zero the (B) dial.

3. Lift up on the End Play Checking Tool as far as it will move and note the dial indicator reading.

-

If the reading exceeds end play limits, replace the torque converter.

End Play

new or rebuilt:  0.35-0.96 mm (0.014-0.038 inch)
Used:  1.8 mm (0.071 inch) max 

4. Remove the dial indicator and tool.

Drainback Test|Page 6415 > < Drainback Test