Expedition 4WD V8-281 4.6L SOHC (1998)
6. Connect the two inlet lines.
-
Connect the fitting and loosely install the nut.
7. Install the inlet line.
-
Install the end without tape through the floor.
8. Connect the inlet line to the inlet line.
1
Connect the line.
2
Loosely install the nut.
9. Tighten the four peanut fittings.