ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Receiver Dryer|Description and Operation|Page 10302 > < Receiver Dryer|Description and Operation|Page 10300
Page 3
background image

6. Fit Spring Lock Coupling Disconnect Tool to the condenser lines so that the spring lock coupling tool can enter the cage opening to release the

A/C tube lock coupling spring.

7. Push the tool into the cage opening to release the female fitting from the A/C tube lock coupling spring.

8. Pull the spring lock coupling fittings apart.

9. Remove the suction accumulator/drier.

10. Drain the oil from the removed suction accumulator/drier into a suitable measuring container. It may he necessary to drill one or two 12.7 mm

(1/2 inch) holes in the bottom of the old suction accumulator/drier to make sure that all the oil has drained out.

INSTALLATION

1. Add refrigerant oil.

^

Use Motorcraft YN-12b Refrigerant Oil F2AZ-19577-AC or equivalent meeting Ford specification WSH-M1C231-B.

NOTE:  Add the same amount of clean new refrigerant oil that was removed, plus 59 ml (two fluid ounces) to the new suction
accumulator/drier. Use only the oil specified for the vehicle being serviced.

2. Transfer the A/C cycling pressure switch to the new suction accumulator/drier.
3. Install new O-rings.

NOTE:  Lubricate new O-ring seals liberally with clean Motorcraft YN-12b Refrigerant Oil F2AZ-19577-AC or equivalent meeting Ford

Receiver Dryer|Description and Operation|Page 10302 > < Receiver Dryer|Description and Operation|Page 10300