Engine Timing Components - Specifications for Explorer 4WD V6-40L (2009)
-
Tighten to 10 Nm (89 lb-in).
15. Position the generator bracket and install the 3 bolts.
-
Tighten to 42 Nm (31 lb-ft).
16. Connect the generator electrical connector and attach the wiring harness retainer.
17. Connect the generator B+ terminal and install the nut.
-
Tighten to 8 Nm (71 lb-in).
18. Connect the heater hose to the coolant pump.
19. Position the accessory drive belt tensioner and install the bolt.
-
Tighten to 47 Nm (35 lb-ft).
20. Connect the lower radiator hose.
21. Install the 5 cylinder block cradle-to-front cover bolts.
-
Tighten to 14 Nm (124 lb-in).
22. Position the wiring harness bracket and install the nut.
-
Tighten to 20 Nm (177 lb-in).
23. Install the crankshaft front seal. For additional information, refer to Crankshaft Front Seal See: Seals and Gaskets/Front Crankshaft Seal/Service
and Repair.
24. Connect the battery ground cable.
25. Fill the engine cooling system.