ford Workshop Repair Guides

Ford Explorer 4WD V6 Service and Repair Manuals

Variable Valve Timing > < Timing Cover|Specifications|Page 2096
Page 5
background image

-

Tighten to 10 Nm (89 lb-in).

15. Position the generator bracket and install the 3 bolts.

-

Tighten to 42 Nm (31 lb-ft).

16. Connect the generator electrical connector and attach the wiring harness retainer.

17. Connect the generator B+ terminal and install the nut.

-

Tighten to 8 Nm (71 lb-in).

18. Connect the heater hose to the coolant pump.

19. Position the accessory drive belt tensioner and install the bolt.

-

Tighten to 47 Nm (35 lb-ft).

20. Connect the lower radiator hose.

21. Install the 5 cylinder block cradle-to-front cover bolts.

-

Tighten to 14 Nm (124 lb-in).

22. Position the wiring harness bracket and install the nut.

-

Tighten to 20 Nm (177 lb-in).

23. Install the crankshaft front seal. For additional information, refer to Crankshaft Front Seal  See: Seals and Gaskets/Front Crankshaft Seal/Service

and Repair.

24. Connect the battery ground cable.

25. Fill the engine cooling system.

Variable Valve Timing > < Timing Cover|Specifications|Page 2096