Explorer 4WD V8-302 5.0L VIN P SFI (2000)
2. Inspect the lead frame for damage.
-
Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
-
If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.
3. Connect the molded lead frame to the solenoids.
-
Connect the bulkhead inter-connector by pressing it in place by hand and fully seating the connector in place.
-
Connect the EPC solenoid by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully