Page 19
background image

Number

Refer to Wiring Diagram Set 14, Module Communications Network for schematic and connector information.  See: Diagrams/Electrical
Diagrams/Diagrams By Number

Normal Operation

The Smart Junction Box (SJB) communicates with the scan tool through the Medium Speed Controller Area Network (MS-CAN).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

SJB

PINPOINT TEST H: THE SJB DOES NOT RESPOND TO THE SCAN TOOL

NOTICE:  Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.

-------------------------------------------------
H1 CHECK THE SJB FUSE FOR VOLTAGE

-

Ignition OFF.

-

NOTE: Measurements are taken with the fuses installed.

-

Measure the voltage between the SJB fuse 2 (5A) and ground.

-

Are the voltages greater than 10 volts?

Yes

GO to H3.

No

VERIFY the Smart Junction Box (SJB) fuse 2 (5A) is OK. If OK, GO to H2. If not OK, REFER to the Wiring Diagrams to identify the possible causes
of the circuit short. CLEAR the DTCs. REPEAT the network test with the scan tool.  See: Diagrams/Electrical Diagrams/Diagrams By Number

-------------------------------------------------
H2 CHECK THE SJB VOLTAGE SUPPLY CIRCUIT FOR AN OPEN

-

Disconnect: SJB C2280e.

-

Measure the voltage between the SJB C2280e-1, circuit SBB03 (BU/RD), harness side and ground.

-

Is the voltage greater than 10 volts?

Yes

GO to H5.