Pinpoint Test H: All The Stoplamps Are Inoperative

Stoplamps

Pinpoint Tests

Pinpoint Test H: All The Stoplamps Are Inoperative

Refer to Wiring Diagram Set 90, Turn Signal/Stop/Hazard Lamps for schematic and connector information.  See: Diagrams/Electrical
Diagrams/Diagrams By Number

Normal Operation

The stoplamp switch is supplied voltage through circuit SBP22 (BN/RD) from the Smart Junction Box (SJB). When the brake pedal is applied, the
stoplamp switch routes voltage to the SJB through circuit CCB08 (VT/WH) which then supplies voltage to all the stoplamps.

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

Stoplamp switch

-

SJB

PINPOINT TEST H: ALL THE STOPLAMPS ARE INOPERATIVE

NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.

-------------------------------------------------
H1 CHECK CIRCUIT SBP22 (BN/RD) FOR VOLTAGE

-

Ignition OFF.

-

Disconnect: Stoplamp Switch C278.

-

Measure the voltage between the stoplamp switch C278-1, circuit SBP22 (BN/RD), harness side and ground.

-

Is the voltage greater than 10 volts?

Yes

GO to H3.

No

VERIFY the SJB fuse 22 (15A) is OK. If OK, GO to H2. If not OK, REFER to the Wiring Diagrams to identify the possible causes of the circuit short.

-------------------------------------------------
H2 CHECK CIRCUIT SBP22 (BN/RD) FOR AN OPEN

Initial Inspection and Diagnostic Overview|Page 8253 > < Initial Inspection and Diagnostic Overview|Page 8251