F 150 2WD Lightning V8-5.4L SOHC SC VIN 3 (2001)
Installation
1. Install the EPC solenoid.
2. Inspect the lead frame for damage.
-
Using the special tool, check all the lead frame solenoid connections.
-
If the special tool passes through any connector pin, install a new lead frame.
3. Connect the molded lead frame to the solenoids.
-
Connect the bulkhead inter-connector.
-
Connect the EPC solenoid.
-
Connect the TCC.
-
Connect the shift solenoid SSA and SSB.
4. Install the manual control lever Manual Control ever Shaft and Seal in this section.