F 150 2WD Lightning V8-5.4L SOHC SC VIN 3 (2001)
9. Install the heat shield bolts (one each side).
10. Remove the High-Lift Jack.
11. Install the transmission mount nuts.
12. Install the VSS.
1. Install the VSS.
2. Install the bolt.
3. Connect the electrical connector.
13. Install the rear driveshaft.
1. Position the rear driveshaft.
2. Install the bolts.