F 150 2WD Pickup V8-4.6L (2002)
2
Remove the EPC solenoid.
Installation
1. Install the EPC solenoid.
1
Install the EPC solenoid.
2
Install the EPC solenoid bracket and bolt.
2. Inspect the lead frame for damage.
-
Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
-
If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.
3. Connect the molded lead frame to the solenoids.
-
Connect the bulkhead inter-connector by pressing it in place by hand and fully seating the connector in place.
-
Connect the EPC solenoid by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully
through the connector slots.
-
Connect the TCC by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the
connector slots.
-
Connect the shift solenoid SSA and SSB by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals