F 150 2WD Pickup V8-5.4L Prop SOHC VIN Z (1998)
5. Remove the power steering fluid cooler.
(1) Remove the bolts.
(2) Remove the fluid cooler.
INSTALLATION
1. To install, reverse the removal procedure.
2. Fill and leak check the system.
5. Remove the power steering fluid cooler.
(1) Remove the bolts.
(2) Remove the fluid cooler.
INSTALLATION
1. To install, reverse the removal procedure.
2. Fill and leak check the system.