ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 9495 > < Initial Inspection and Diagnostic Overview|Page 9493
Page 13
background image

AC4-AC6

Tests AD: The Trailer Battery Charging Is Inoperative/Does Not Operate Correctly

PINPOINT TEST AD: THE TRAILER BATTERY CHARGING IS INOPERATIVE/DOES NOT OPERATE CORRECTLY

Normal Operation

The trailer battery charging is accomplished through the use of the trailer tow battery charge relay. The trailer tow battery charge relay is supplied
voltage and ground through the central junction box (CJB). The trailer tow battery charge relay is energized when the ignitions switch is in the RUN
position. When energized, the trailer tow battery charge relay routes voltage from the CJB fuse 106 (30A) to the trailer tow connector through circuit
49 (OG).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

Trailer tow connector

-

Trailer tow battery charge relay

-

CJB

-

Trailer

Initial Inspection and Diagnostic Overview|Page 9495 > < Initial Inspection and Diagnostic Overview|Page 9493