F 150 4WD Pickup V8-5.4L CNG VIN M (2001)
6. Position the axle support and install the bolts.
7. Tighten the bolts.
8. Remove the jack stand.
9. Lower the vehicle.
10. Fill the engine with clean engine oil.
11. Start the engine and inspect for leaks.