F 250 2WD LD Pickup V8-4.6L SOHC VIN 6 (1997)
10. Install the (B) heater water hose and position the (A) clamp.
11. Position the (A) power steering bracket and install the (B) three power steering pump bracket bolts.
12. Connect the following electrical connections:
^
ECT sensor electrical connector (A).
^
Water temperature indicator sending unit electrical connector (B).
13. Install the generator.
14. Install the drive belt.
15. Connect the eight spark plug wires, if necessary.
16. Connect the four LH fuel injector electrical connectors.