F 250 2WD Pickup V6-4.2L VIN 2 (1998)
tightened first while the control arms are held at the curb position ride height.
3. Install the upper ball joint castellated nut.
(1) Install the nut.
(2) Install a new cotter pin.
4. Install the tire and wheel assembly.
NOTE: If equipped with air suspension, reactivate the system by turning on the air suspension switch.
5. Inspect and adjust the front end alignment.