F 250 2WD Pickup V8-4.6L SOHC VIN 6 (1999)
7. Connect the EGR connections:
^
Two differential pressure feedback transducer hoses (A).
^
EGR valve to exhaust manifold tube upper fitting (B).
^
EGR valve to exhaust manifold tube lower fitting (C).
8. Install the PCV hose.
9. Install the brake booster bracket and tube.
1
Install the brake booster tube.
2
Install the two hose clamps.
3
Install the nut.