ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Valve Body, A/T|Removal and Installation|Page 4684 > < Valve Body, A/T|Removal and Installation|Page 4682
Page 4
background image

5. Remove the converter drain back valve and solenoid pressure supply screen.

6. Remove the main control valve body cover plate.

1

Remove the thirteen bolts.

2

Remove the valve body cover plate and gasket.

Assembly

1. NOTE:  Before beginning assembly, perform/inspect the following:

When building up subassemblies and assembling the transmission, ALWAYS use new gaskets and seals.

All fasteners must be tightened to the torque specification indicated.

When building up subassemblies, each component part should be lubricated with clean transmission fluid. It is also good practice to lubricate the
subassemblies as they are installed in the case.

Needle bearings, thrust washers and seals should be lightly coated with petroleum jelly during subassembly buildup or transmission assembly.

Many components and surfaces in the transmission are precision machined. Careful handling during disassembly, cleaning, inspection and

Valve Body, A/T|Removal and Installation|Page 4684 > < Valve Body, A/T|Removal and Installation|Page 4682