F 250 2WD Super Duty V8-5.4L (2008)
Part 2
Removal and Installation
1. Disconnect the battery.
2. Remove the screw and position the battery ground cable terminal aside.
-
To install, tighten to 12 Nm (9 lb-ft).
3. Remove the bolt and position the battery cable harness bracket aside.
-
To install, tighten to 30 Nm (22 lb-ft).
4. Remove the nut and position the battery ground cable terminal aside.
-
To install, tighten to 40 Nm (30 lb-ft).
5. Remove the bolt and position the battery ground cable eyelet aside.
-
To install, tighten to 25 Nm (18 lb-ft).
6. Remove the nut and position the starter solenoid wire terminal aside.
-
To install, tighten to 5 Nm (44 lb-in).
7. Remove the nut and position the starter solenoid positive cable terminal aside.
-
To install, tighten to 12 Nm (9 lb-ft).
8. Remove the nut and position the generator B+ cable terminal and the power distribution box (PDB) cable terminal aside.
-
To install, tighten to 9 Nm (80 lb-in).
9. Disconnect the starter relay electrical connector.
10. Remove the battery cable assembly.