F 250 2WD Super Duty V8-5.4L VIN 5 (2006)
5. Connect the EVAP vapor tube quick connect couplings and the EVAP canister purge valve electrical connector. For additional information, refer
to Fuel Delivery and Air Induction.
6. Connect the engine wiring harness retainer to the EVAP canister purge valve bracket.
7. Connect the crankcase vent tube quick connect coupling to the valve cover. For additional information, refer to Fuel Delivery and Air Induction.
8. Install the RH ignition coils. For additional information, refer to Ignition System.
9. Install the RH VCT oil control solenoid. For additional information, refer to Computers and Control Systems.
10. If equipped, install the transmission filler tube.