F 250 2WD Super Duty V8-5.4L VIN 5 (2006)
-
Install new O-ring seals.
-
Lubricate the refrigerant system with the correct amount of clean PAG oil.
8. Evacuate, leak test and charge the refrigerant system.
-
Install new O-ring seals.
-
Lubricate the refrigerant system with the correct amount of clean PAG oil.
8. Evacuate, leak test and charge the refrigerant system.