F 250 2WD Super Duty V8-5.4L VIN 5 (2006)
15. Position the drag link, and install the nut and cotter pin.
^
Tighten to 200 Nm (148 ft. lbs.).
Vehicles with 6.0L diesel
16. Install the charge air cooler duct.
^
Tighten the clamps to 12 Nm (9 ft. lbs.).
17. Install the auxiliary battery tray.
All vehicles
18. Install the driver air bag.