F 250 4WD Pickup V8-5.4L SOHC VIN L (1999)
1. Install the EPC solenoid.
2. Connect the molded lead frame to the solenoids.
-
Connect the bulkhead inter-connector.
-
Connect the Electronic Pressure Control (EPC) solenoid.
-
Connect the Torque Converter Clutch (TCC).
-
Connect the shift solenoid SSA and SSB.
3. Install the manual control lever.