F 250 4WD Super Duty V10-6.8L VIN Y (2006)
6. Position the Y-pipe and install the 4 nuts.
^
Tighten to 40 Nm (30 ft. lbs.).
7. Remove the special tools.
8. If installing the RH engine mount, install the starter. For additional information, refer to Starting System.
9. Install the upper cooling fan shroud. For additional information, refer to Cooling System.
10. Install the generator. For additional information, refer to Alternator.
11. Install the throttle body spacer. For additional information, refer to Fuel Delivery and Air Induction.
12. Install the air cleaner outlet pipe. For additional information, refer to Fuel Delivery and Air Induction.
13. Connect the battery ground cable. For additional information, refer to Battery.