F 250 4WD Super Duty V10-6.8L VIN Y (2006)
5. Remove the pressure control solenoid (PC-A).
1
Remove the (E) retaining clips from the pressure control solenoid (PC-A) and the shift solenoid (SSPC_C).
2
Partially slide the shift solenoid (SSPC_C) back enough to gain clearance to remove the pressure control solenoid (PC-A).
3
Remove the pressure control solenoid (PC-A).
Installation
1. Assemble the main control valve body.
1
Install the pressure control solenoid (PC-A) and install the (E) retaining clip.
2
Push the bulkhead connector through the solenoid body and twist the bulkhead connector, locking it into place.
3
Install the shift solenoid (SSPC_C) back into place and install the (E) retaining clip.
4
Connect the electrical connectors to the pressure control solenoid (PC-A) and the shift solenoid (SSPC_C).