F 250 4WD Super Duty V8-6.4L DSL Turbo (2008)
22. Install the nut and bolt for the vertical EGR cooler.
^
Tighten to 31 Nm (23 lb-ft).
23. Install the retaining clip and retaining nut on the stud.
^
Tighten to 12 Nm (106 lb-inch).
24. Connect the EGRT sensor electrical connector. Connect the EGR cooler hose and connect to the retaining clips.
^
Tighten to 4 Nm (35 lb-inch).