F 250 4WD Super Duty V8-6.4L DSL Turbo (2008)
18. Connect the TB electrical connector.
19. NOTE: Install a new horizontal EGR cooler gasket prior to installing the vertical EGR cooler.
Position the vertical EGR cooler assembly and loosely install the bolts.
20. Position a new vertical EGR cooler gasket and install the stud.
^
Tighten to 31 Nm (23 lb-ft).
21. Install the nut and bolt for the vertical EGR cooler.
^
Tighten to 31 Nm (23 lb-ft).