F 250 4WD Super Duty V8-6.4L DSL Turbo (2008)
15. Connect the TB body electrical connector.
16. NOTE: Install a new horizontal EGR cooler gasket prior to installing the vertical EGR cooler.
Position the vertical EGR cooler assembly and loosely install the bolts.
17. Install a new vertical EGR cooler gasket and install the stud.
-
Tighten to 31 Nm (23 lb-ft).
18. Install the nut and bolt for the vertical EGR cooler.
-
Tighten to 31 Nm (23 lb-ft).