ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Variable Valve Timing Cover / Housing > < Procedures|Page 1911
Page 3
background image

Apply clean engine oil to each end of the push rods and insert them into their respective positions.

2. NOTE: Coat the end of each valve stem with clean engine oil.

Install the valve bridges.

3. NOTE: Apply clean engine oil to the top center of each valve bridge and rocker arm ball socket.

Install the rocker arm assemblies and the bolts in the following sequence.

1. Position the crankshaft with the No. 1 and No. 4 cylinders at approximately Top Dead Center (TDC) by observing the damper dowel pin and

clocking it to the 10:30 position (as viewed from the front of the engine).

2. Determine which cylinder is actually in the firing position by observing the push rods for the No. 3 intake and No. 8 intake valves.

3. If the No. 3 intake push rod shows cam lift, this is the No. 1 firing position. Tighten only fulcrum plates No. 1, 2, 7, 8 per Substeps 4 through

6. If the No. 8 intake push rod shows cam lift, this is the No. 4 firing position. Tighten only fulcrum plates No. 3, 4, 5, 6 per Substeps 4
through 6.

4. Partially run down both M10 bolts until they contact the fulcrum plate.

5. Fully run down and tighten the inboard (upper) bolt.

-

Tighten to 61 Nm (45 lb-ft).

6. Fully run down and tighten the outboard (lower) bolt.

-

Tighten to 61 Nm (45 lb-ft).

7. Rotate the crankshaft one revolution to position it at the alternate cylinder TDC (dowel again at 10:30 position).

8. Identify the remaining group of fulcrum plates per substep 3 and tighten per Substeps 4 through 6.

9. Verify that the pivot foot is centered on the valve bridge.

4. Install the fuel rail.

Variable Valve Timing Cover / Housing > < Procedures|Page 1911