F 350 2WD Super Duty V8-6.4L DSL Turbo (2009)
-
To install, tighten to 31 Nm (23 lb-ft).
12. Disconnect the EP sensor tube fitting from the EGR oxidation pipe.
-
To install, tighten to 20 Nm (177 lb-in).
13. Remove the nut and the EP sensor and tube assembly.
-
To install, tighten to 9 Nm (80 lb-in).
14. Remove the 4 LH valve cover bracket nuts.
-
To install, tighten to 9 Nm (80 lb-in).
15. Remove the 3 LH valve cover bracket assembly nuts. Separate and remove the upper and lower LH valve cover brackets.
-
To install, tighten to 31 Nm (23 lb-ft).
16. Remove the 6 bolts, the 4 stud bolts and the LH valve cover. Remove the discard the valve cover gasket.
-
To install, tighten to 9 Nm (80 lb-in).
17. To install, reverse the removal procedure.
-
Install a new valve cover gasket.
-
Alternate tightening the valve cover bolts to tighten evenly.
-
Make sure that the turbocharger crossover tube is square to the turbocharger when the valve cover bracket is installed.