F 350 2WD Super Duty V8-6.4L DSL Turbo (2009)
23. NOTICE: Failure to install and correctly tighten the EGR-Oxidation Catalytic Converter (OC) pipe bracket bolt will result in damage to
the horizontal EGR cooler and possible engine damage.
Tighten the EGR-OC bracket-to-cylinder head bracket bolt.
-
Tighten to 31 Nm (23 lb-ft).
24. NOTICE: Failure to install and correctly tighten the exhaust gas recirculation (EGR)-Oxidation Catalytic Converter (OC) pipe bracket
bolt will result in damage to the horizontal EGR cooler and possible engine damage.
Tighten the EGR cylinder head bracket-to-cylinder head bolt.
-
Tighten to 62 Nm (46 lb-ft).
25. Install the EP sensor tube fitting.
-
Tighten to 20 Nm (177 lb-in).
26. Connect the EGRT sensor electrical connector.
27. NOTE: Do not install the exhaust downpipe until the RH turbocharger inlet pipe and the EGR-OC pipe are installed and all fasteners are
tightened.