ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Intake Manifold|Lower|Page 3274
Page 3
background image

9. Install EGR tube. Tighten flange nuts to 41-54 Nm (30-40 ft. lbs.).
10. Install canister purge lines to fittings on throttle body.
11. Connect water heater lines to the throttle body.
12. Connect PCV hose to rear of upper intake manifold.
13. Connect vacuum lines to vacuum tree, EGR external pressure valve and fuel pressure regulator.
14. Position accelerator cable bracket with cables to upper intake manifold. Install two retaining bolts and tighten to 11-13 Nm (8-10 ft. lbs.). Connect

throttle cable to throttle body.

15. Connect electrical connectors at idle air control valve, throttle position sensor and EGR position sensor.
16. Install throttle body shield.
17. Fill and bleed cooling system.

Lamps and Indicators - Engine > < Intake Manifold|Lower|Page 3274