ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Inspection and Assembly Requirements|Page 9618 > < Evaporator Core|Description and Operation|Page 9615
Page 1
background image

Evaporator Core: Service and Repair
Inspection and Assembly Requirements

NOTE:  Any time a hose or component connection leak is observed, to correctly service the leak, the connector fitting must be separated, cleaned and a
new O-ring installed. The O-ring and connector surfaces should be lubricated with clean refrigerant oil prior to assembly.

O-ring seal surfaces must be free of dirt, lint, burrs and scratches.

All O-rings must be lubricated with clean refrigerant oil immediately prior to installation.

Inspection and Assembly Requirements|Page 9618 > < Evaporator Core|Description and Operation|Page 9615