F 350 4WD Super Duty V8-6.4L DSL Turbo (2008)
19. Connect the EGR valve and TB electrical connectors.
20. NOTE: Install a new horizontal EGR cooler gasket prior to installing the vertical EGR cooler.
Position the vertical EGR cooler assembly and loosely install the bolts.
21. Install a new vertical EGR cooler gasket and the stud.
^
Tighten to 31 Nm (23 lb-ft).