F 350 4WD Super Duty V8-6.4L DSL Turbo (2008)
Pressure Regulating Solenoid: Service and Repair
Line Pressure Control Solenoid - PC-A
Line Pressure Control Solenoid - PC-A
Material
Removal
1. With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to Maintenance/Service and Repair.
2. Remove the transmission main control valve body.
3. Remove the solenoid body electrical connector O-ring seal.
4. Partially remove the solenoid body electrical wire harness.
1. Remove the wire harness to solenoid body bolts.
2. Disconnect the electrical connector from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
3. Lift the tab on the bulkhead connector, twist and push the bulkhead connector through the solenoid body.