ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 10962 > < Initial Inspection and Diagnostic Overview|Page 10960
Page 13
background image

AC8 Continued

Normal Operation

The trailer tow battery charge relay coil receives voltage from the central junction box (CJB) fuse 27 (15A) through circuit 295 (LB/PK) when the
ignition switch is in the RUN position. Ground for the trailer tow battery charge relay coil is supplied through circuit 57 (BK). The CJB fuse 107 
(20A) supplies voltage to the trailer tow battery charge relay. When the trailer tow battery charge relay is energized, the voltage is routed to the trailer
tow connector through circuit 49 (OG).

Possible Causes

-

Fuse

-

Circuit 49 (OG) open

-

Circuit 57 (BK) open

-

Circuit 295 (LB/PK) open

-

Trailer tow battery charge relay

-

CJB

-

Trailer

Initial Inspection and Diagnostic Overview|Page 10962 > < Initial Inspection and Diagnostic Overview|Page 10960