F 450 2WD Super Duty V8-6.0L DSL Turbo VIN P (2006)
4. Remove the stud and position the battery ground cable terminal aside.
-
To install, tighten to 47 Nm (35 lb-ft).
5. NOTE: Position the RH splash shield aside to access the battery ground cable bolt.
Remove the bolt and position the battery ground cable-to-frame terminal aside.
-
To install, tighten to 25 Nm (18 lb-ft).
Auxiliary negative battery cable
6. NOTE: Position the LH splash shield aside to access the battery ground cable bolt.
Remove the bolt and position the auxiliary battery ground cable-to-frame terminal aside.
-
To install, tighten to 25 Nm (18 lb-ft).
Positive battery cable
7. Remove the starter solenoid terminal cover.
8. Remove the nut and position the starter solenoid positive cable terminal aside.
-
To install, tighten to 12 Nm (9 lb-ft).
9. Remove the nut and position the starter solenoid wire terminal aside.
-
To install, tighten to 5 Nm (44 lb-in).
10. Remove the nut and position the generator B+ cable terminal aside.
-
To install, tighten to 8 Nm (71 lb-in).
11. Disconnect the starter relay electrical connector.
12. Remove the 9 pin-type retainers and the upper radiator air deflector.
13. Remove the 4 bolts and position the 2 upper radiator support brackets aside.
-
To install, tighten to 12 Nm (9 lb-ft).
14. Remove the nut and position the CJB cable terminal aside.
-
To install, tighten to 8 Nm (71 lb-in).
15. Release the positive battery cable locators and remove the cable.
16. To install, reverse the removal procedure.