F 450 4WD Super Duty V8-6.4L DSL Turbo (2008)
3. Remove the roof opening panel frame.
1
Disconnect the 4 roof opening panel drain hoses.
2
Remove the 11 bolts.
-
To install, tighten to 10 Nm (89 lb-in).
3
Remove the roof opening panel frame.
4. To install, reverse the removal procedure. If a new roof opening panel frame is being installed, transfer the existing roof opening panel motor, air
deflector, rear trough, roof opening panel glass and roof opening panel shield onto the new frame assembly. Initialize the roof opening panel
motor. For additional information, refer to Roof Opening Panel Motor Initialization. See: Testing and Inspection/Programming and Relearning