F 450 4WD Super Duty V8-6.4L DSL Turbo (2008)
Install the high-pressure fuel injection pump heat shield in the vehicle and install the 2 center bolts.
-
Tighten to 13 Nm (115 lb-in).
5. Position the fuel tube bracket and ground wire. Install the retaining nuts and bolt for the high-pressure fuel pump shield.
-
Tighten the fuel line bracket nuts to 7 Nm (62 lb-in).
-
Tighten the remaining fasteners to 13 Nm (115 lb-in).
6. Position the EGR-OC pipe in the vehicle.
7. Install the turbocharger. Carry out the Turbocharger - Body On procedure. See: Turbocharger/Service and Repair/Removal and
Replacement/Turbocharger - Body On