Normal Operation

The Smart Junction Box (SJB) communicates with the scan tool through the Medium Speed Controller Area Network (MS-CAN). Circuits VDB06
(GY/OG) (MS-CAN +) and VDB07 (VT/OG) (MS-CAN -) provide the network connection to the SJB. Voltage for the SJB is provided directly from the
internal SJB busbar through SJB fuse 5 (10A). Ground is provided by circuit GD179 (BK).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

SJB

PINPOINT TEST H: THE SJB DOES NOT RESPOND TO THE SCAN TOOL

NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.

NOTE: Failure to disconnect the battery when instructed will result in false resistance readings.

-------------------------------------------------
H1 CHECK THE SJB FUSE FOR VOLTAGE

-

Ignition OFF.

-

Measure the voltage between the back of the SJB fuse 5 (10A) terminals (both sides) and ground.

-

Are the voltages greater than 10 volts?

Yes

GO to H2.

No

VERIFY the SJB fuse 5 (10A) is OK. If OK, REPAIR the circuit. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
H2 CHECK THE SJB GROUND CIRCUIT FOR AN OPEN

-

Disconnect: Negative Battery Cable.

-

Disconnect: SJB C2280d.

-

Measure the resistance between the SJB, harness side and ground as follows:

Initial Inspection and Diagnostic Overview|Page 3038 > < Initial Inspection and Diagnostic Overview|Page 3036