ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 10612 > < Initial Inspection and Diagnostic Overview|Page 10610
Page 20
background image

H1 Continued

Normal Operation

Under normal operation, the smart junction box (SJB) provides voltage to the individual demand lamps through circuit 705 (LG/OG). Ground for the
lamps is provided through circuit 1205 (BK).

Possible Causes

-

An open in circuit 705 (LG/OG)

-

Lamp

Test I: The Illuminated Entry is Inoperative

PINPOINT TEST I: THE ILLUMINATED ENTRY IS INOPERATIVE

I1

Initial Inspection and Diagnostic Overview|Page 10612 > < Initial Inspection and Diagnostic Overview|Page 10610