ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2547 > < Initial Inspection and Diagnostic Overview|Page 2545
Page 34
background image

-

Is the voltage greater than 6 volts?

Yes

REPAIR the circuit. CLEAR the DTCs. REPEAT the network test with the scan tool.

No

The CAN has tested within specifications. Go To Pinpoint Test l to diagnose the intermittent MS-CAN fault.  See: Pinpoint Test I: The HVAC Module
Does Not Respond To The Scan Tool

-------------------------------------------------
M5 CHECK THE MS-CAN TERMINATION RESISTOR

-

Measure the resistance between the DLC C251-3, circuit VDB06 (GY/OG), harness side and the DLC C251-11, circuit VDB07 (VT/OG), harness
side.

-

Is the resistance between 108 and 132 ohms?

Yes

GO to M6.

No

GO to M9.

-------------------------------------------------
M6 CHECK THE MS-CAN TERMINATION RESISTOR WITH THE SJB DISCONNECTED

-

Disconnect: Smart Junction Box (SJB) C2280b.

-

Measure the resistance between the DLC C251-3, circuit VDB06 (GY/OG), harness side and the DLC C251-11, circuit VDB07 (VT/OG), harness
side.

-

Is the resistance between 108 and 132 ohms?

Yes

GO to M7.

No

GO to M8.

-------------------------------------------------
M7 CHECK THE MS-CAN CIRCUITS BETWEEN THE SJB AND THE
DLC FOR AN OPEN

Initial Inspection and Diagnostic Overview|Page 2547 > < Initial Inspection and Diagnostic Overview|Page 2545