ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Sunroof / Moonroof Windguard > < Sunroof / Moonroof Switch|Diagrams
Page 1
background image

Sunroof / Moonroof Switch: Testing and Inspection

1. Measure the resistance between terminals.
2. Apply +12V battery positive to the roof opening panel control switch C522 pin 1, component side and 0v battery negative to the roof opening

panel control switch C522 pin 6, component side. The LED should illuminate.

3. If all measurements of the roof opening panel control switch are as noted, return to the Pinpoint Test. Otherwise install a new roof opening panel

control switch.  See: Testing and Inspection/Pinpoint Tests

Sunroof / Moonroof Windguard > < Sunroof / Moonroof Switch|Diagrams